Industrial Systems > AT_Hardcoat Conductible

< back

 

APPLICATION TIPS


*** For all the epoxy applications, dead times between layers can of course be utilized for other works, besides dead times can be minimized if different phases of the application take place in different parts of the project. Moreover, for bigger surfaces more square meters are possible per day in average because you will be able to work on bigger open surface with the same materials.

 

POLEPOX-PR 824


Application temperature:
10 to 35º C

Working temperature of applied material:
-30 to 50º C

Tools of application:
Double-rubber edge squeegee for smooth concrete surfaces or brush for concrete surfaces in general

Consumption (20-25º C):
250-300 gr/m² on power-troweled industrial floors, in two layers at least (usually three or more), until the surface is saturated with primer, becoming glossy and gelly.

Time between primer layers:
30-60 minutes

Covering of primer:
in 8-10 hours


COPPER TAPES

Creation of copper-tape grid with frames 2-4 m² in area and also every 100 m² of area (2 points of grounding)

 

POLEPOX 833-CV

Application temperature:
10 to 35º C

Working temperature of applied material:
-5 to 40º C

Tools of application:
mohair roller

Consumption (20-25º C):
0.25-0.3 kg/ m² in one layer
Covering of varnish: in 5-8 hours

 

POLEPOX COAT 830-CC

Application temperature:
10 to 35º C

Working temperature of applied material:
-5 to 40º C

Tools of application:
Spotty roller with 2.1 mm spots for 1-1.2 mm thickness in one layer -consumption (20-25º C): 1.5 kg/ m² (followed immediately by spiked roller over the surface to kill the air pockets and level out the surface)

*** For more detailed technical information you should refer to the Technical Data Sheets (TDS) available for all products involved              

< back