 HARDCOAT ELASTIC

*** For all the epoxy applications, dead times between layers can of course be utilized for other works, besides dead times can be minimized if different phases of the application take place in different parts of the project. Moreover, for bigger surfaces more square meters are possible per day in average because you will be able to work on bigger open surface with the same materials.

 

POLEPOX-PR 824

 

Application temperature:
10 to 35º C

Working temperature of applied material:
-30 to 50º C. Tools of application: Double-rubber edge squeegee for smooth concrete surfaces or brush for concrete surfaces in general

Tools of application:
Double-rubber edge squeegee for smooth concrete surfaces or brush for concrete surfaces in general

Consumption (20-25º C):
250-300 gr/m² on power-troweled industrial floors, in two layers at least (usually three or more), until the surface is saturated with primer, becoming glossy and gelly 

Time between primer layers:
30-60 minutes

Covering of primer:
in 8-10 hours

 

POLEPOX FLOOR 873-EL

Application temperature:
10 to 35º C 

Working temperature of applied material:
-30 to 50º C

Tools of application:
Spotty roller with 2.1 mm spots for approx. 1 mm thickness in one layer -consumption (20-25º C): 1.5 kg/ m² (followed immediately by spiked roller over the surface to kill the air pockets and level out the surface) or paint roller for 0.7-0.9 mm thickness in two layers -consumption: approx. 1 kg/ m²
 

3 people will be needed for 3 days for a surface of 300-400m²

1st working day (8 hours): Grinding and cleaning, joint filling with the two-component epoxy putty for horizontal surfaces EPOFIX-H 207, limited repairing with EPOFIX-H 207 or the two-component epoxy putty, squeegee-applied EPOFIX S 214
2nd day: Grinding of joints, sweeping of floor, priming of the whole surface
3rd day: Application of the two-component, elastic, self-leveling epoxy floor coating POLEPOX COAT 873-EL in one layer
On the last day of application, one additional worker will be needed to help carry around the ready-mix POLEPOX COAT 873-EL .

*If extensive repairing will be needed, times will be affected accordingly
*If a second POLEPOX COAT 873-EL layer will be applied, one more day will be needed.
*In all cases, the substrate is considered to be a decent power-troweled one.

 

 